Abrams Park Pump Station Rehabilitation

PROJECT DESCRIPTION
Grayling provided design services for the rehabilitation of the Abrams Park sanitary pump station in Ridgefield, Washington. The original vacuum prime pump station had reached the end of its useful life. The project included hydraulic analysis to size new pumping equipment, rehabilitation of the existing wetwell with epoxy coatings, and installation of new mechanical and electrical equipment to meet District design standards.
PROJECT TYPE
Wastewater Pump Station
SERVICES
Design, hydraulic analysis, mechanical and electrical system upgrades, and preparation of construction documents.
CLIENT
Clark Regional Wastewater District, WA
