East Hockinson Reservoir #2

PROJECT DESCRIPTION

Clark Public Utilities owns and operates the public drinking water system serving Clark County WA. Water demands in the Hockinson zone have increased steadily in the last decade, resulting in the need for additional source and storage capacity. Constructed in 2002, Hockinson Reservoir #1 is a 1.2 MG welded steel storage tank located in the eastern foothills of Clark County. Hockinson Reservoir #2 will double storage capacity in this area with construction of a second 1.2 MG storage tank. Part of a multidisciplinary team of engineers, Grayling led the tank design as well as coordinated the structural design and coatings requirements with other consultants.

PROJECT TYPE

Water Reservoirs

SERVICES

Reservoir design, multidisciplinary coordination, structural and coating system integration, consultant management, and support through permitting and construction.

CLIENT

Clark Public Utilities, WA