Skip to content

Water System Master Plan & Water Rate Study

PROJECT DESCRIPTION

This project updated the Capital Improvement Plan (CIP), integrated CIP projects into a new rate structure, and initiated predesign for a new tank. The WSMP is a strategic tool for informed decision-making, analyzing the District’s water system, developing a hydraulic model, and identifying improvements and storage capacity. It addresses aging infrastructure, predictive analytics, and seismic resilience for long-term sustainability. The water rate study assessed operating and infrastructure costs, addressing revenue requirements, cost of service, and rate design to develop cost-based, proportional rates that promote conservation, revenue stability, and customer equity. A new 3.0 MG reservoir will meet current and future water storage needs, focusing on water quality, optimal storage, and cost-saving measures. The design will consider tank configuration, contractor access, foundation requirements, and compliance with funding agency standards.

PROJECT TYPE

Water Master Plan, Rate Study, Reservoir Predesign

SERVICES

Water system master planning, hydraulic modeling, rate study, and reservoir predesign.

CLIENT

West Slope Water District, OR

Back To Top